•
Check shape and size
after developing |
-. Check Negative , Positive
separately |
•
Check Side wall per size after developing |
-.Check Negative , Positive
separately
-. Comparison of the same point(in case of
comparison evaluation) |
•
Positive after developing |
-. Comparison before/after
adhesion test |
•
Management SPEC |
-.No attack detected after
test of P/T developing and adhesion more than
50§ |